【单选题】【消耗次数:1】
Before she left to have a holiday, she_______ hard.
worked
has worked
had worked
参考答案:
复制
纠错
相关题目
【单选题】 She has worked here_______many years.
①  since
②  for
③  during
【单选题】 Had he worked hard, he _____ the exams.
①  must have got through
②  would have got through
③  would get through
④  could get through
【单选题】 If he had worked harder, he ___.
①  would succeed
②  had succeeded
③  should succeed
④  would have succeeded
【判断题】 Before he began to study in the university, he had worked in a company for three years.
①  正确
②  错误
【单选题】 She_______ the door before she goes away.
①  had locked
②  is locking
③  has locked
④  was locking
【单选题】 The boy worked hard ______ he could get the prize.
①  so that
②  so as to
③  so as
④  in order to
【单选题】 ___ is often the case, we have worked out the production plan.
①  Which
②  When
③  What
④  As
【单选题】 -We’ve worked for a long time, what about stopping to have a rest? -_____________________.
①  A. I like it.
②  A. You are wonderful.
③  A. That’s a good idea.
④  very good
【单选题】 -Weve worked for a long time, what about stopping a while to have a rest?-_____________________.
①  I like it.
②  You are wonderful.
③  Thats a good idea.
④  ok
【单选题】 When I worked as the general manager of the firm, I sometimes had ___ to visit London on business.
①  opportunity
②  possibility
③  occasion
④  chance
随机题目
【单选题】 下面不属于项目的是( )。
①  安装一条新的生产线
②  开发一种新产品
③  房屋装修
④  邮递员送报纸
【单选题】 企业理财人员应确立( )观念,重视利息的作用。
①  资金时间价值
②  风险
③  机会损益
④  弹性
【单选题】 企业实行全过程成本管理,意味着成本管理的范围涵盖了产品的( )。
①  生产过程
②  设计过程
③  整个寿命周期
④  销售过程
【单选题】 项目的“一次性”是指( )。
①  项目没有确定的开始和结束时间
②  项目有确定的开始和结束时间
③  项目在不确定的时间结束
④  项目可以在任何时候取消
【单选题】 ( )不属于运输合理化的影响因素。
①  运输距离
②  运输工具
③  运输人员
④  运输费用
【单选题】 项目范围管理实质上是一种( )。
①  功能管理
②  质量管理
③  过程管理
④  时间管理
【单选题】 ( )可以缩短现金周转天数。
①  延长应收账款周转天数
②  延长营业周期
③  延长存货周转天数
④  延长应付账款周转天
【单选题】 现金流是英文CashFlow的直译,就是在一段时间内的( )。
①  现金总收入
②  现金净流入
③  现金总支出
④  净利润
【单选题】 随着项目生命周期的进展,资源的投入( )。
①  逐渐变大
②  逐渐变小
③  先变大再变小
④  先变小再变大
【单选题】 ( )是利用运输管道,通过一定的压力差而完成气体、液体和粉状团体运输的一种现代运输方式。
①  公路运输
②  水上运输
③  航空运输
④  管道运输