【单选题】【消耗次数:1】
How stupid I have been! Why _______ I do that before?
don’t
didn’t
not
参考答案:
复制
纠错
相关题目
【单选题】 He didn’t have the book ____________ I wanted.
①  what
②  \
【判断题】 A: May I have your order now? B: No, I don’t have a choice of meat.
①  正确
②  错误
【单选题】 I don’t know why she avoids __________ her opinion on the subject.
①  to give
②  to be given
③  giving
④  being given
【单选题】 I didn’t mean to do that. Please forgive me.____________
①  Not too bad.
②  Never mind.
③  It’s a pleasure.
④  Thank you.
【单选题】 I didn’t know what to do, but then an idea suddenly ________ to me.
①  appeared
②  happened
③  occurred
④  emerged
【单选题】 I don’ t think it’ s important, _____?
①  doesn’ t
②  is it
③  do I
④  isn’ t
【单选题】 40.—I`m sorry I didn`t do a good job. ---Never mind.____you have tried your best.
①  Aboveall
②  Aboveall
③  Atall
④  Afterall
【单选题】 —Why didn’t you come to join her party? —I______, but I had to look after my ill mother.
①  would have
②  should
③  would do
④  was going to have
【单选题】 If you don’t go, ____ I.
①  nor shall
②  so don’t
③  neither do
④  so do
【单选题】 Why not buy a cheaper one, ___ you don’t have enough money?
①  since
②  because
③  for
④  though
随机题目
【判断题】 项目的选择应该基于项目的经济分析和财务分析,不能从非经济的角度来选择项目。( )
①  正确
②  错误
【判断题】 项目经理的职责是负责按项目章程的要求实施项目,因而无权修改项目章程。
①  正确
②  错误
【多选题】 定量的项目选择的方法有
①  投资回收期
②  投资回报率
③  净现值法
④  内部报酬率法
【多选题】 项目章程的内容包括
①  职能部门如何参与
②  项目经理及其权责
③  项目的初步预算
④  主要的项目干系人
【单选题】 项目管理的四大目标是( )
①  .范围、成本、进度、风险
②  成本、范围、质量、时间
③  成本、进度、质量、风险
④  范围、时间、质量、进度
【单选题】 下面哪种项目选择的方法考虑了货币的时间价值( )
①  投资回收期法
②  投资回报率法
③  净现值法
④  保本点分析
【单选题】 需求的产生与分析过程包括:(1)需求表达(2)需求确认(3)需求产生(4)技术要求(5)功能要求,他们按顺序依次是( )
①  (3)(2)(1)(4)(5)
②  (3)(2)(1)(5)(4)
③  (1)(2)(3)(4)(5)
④  (2)(3)(1)(4)(5)
【单选题】 在确定项目目标时,应该关注( )
①  时间和成本
②  范围
③  质量
④  以上同等程度关注
【判断题】 在项目干系人管理的对象是重要的项目干系人,至于一些不那么重要的项目干系人,如公众等,可以忽略不管。( )
①  正确
②  错误
【判断题】 云南鲁布革水电工程管理局是我国第一个符合现代项目管理要求的大型项目管理机构。( )
①  正确
②  错误