【单选题】【消耗次数:1】
Now soil in this area is [填空] than it used to be. Something must be done to it.
very good
much better
rather than
even worse
参考答案:
复制
纠错
相关题目
【单选题】 Our food and service are better than _____ used to be.
①  it
②  we
③  they
④  them
【单选题】 18.I’d rather you _____that now than afterwards.
①  know
②  knew
③  had known
④  have known
【单选题】 The TV sets made in China are much better than ______ in Japan.
①  that
②  those
③  them
④  it
【单选题】 [填空]is better than cure.
①  Prevent
②  Prevented
③  Prevention
④  Preventions
【单选题】 My father used to be very weak,_________ now he is much stronger.
①  but
②  at
③  and
④  when
【单选题】 I feel [填空] better than several days ago.
①  more
②  very
③  the
④  much
【单选题】 The computer could calculate much faster and better than man [] however, it could not drink.
①  comma
②  semicolon
【单选题】 [填空] elephant is much heavier than [填空] zebra.
①  a,an
②  an,a
③  the,a
④  the,an
【单选题】 It is better to die ones feet than _______.
①  living on ones knees
②  live on ones knees
③  on ones knees
④  to live on ones knees
【判断题】 This book is better than that one.
①  正确
②  错误
随机题目
【多选题】 工程质量评估报告由( )签字,并加盖监理单位公章。
①  专业监理工程师
②  总监理工程师
③  监理单位技术负责人
④  项目经理
【多选题】 施工总结主要包括( )。
①  管理方面
②  技术方面
③  经验方面
④  经济方面
【多选题】 有抗震要求的框架结构,其纵向受力钢筋的进场复试应有( )计算值的内容。
①  强屈比
②  抗压强度
③  屈标比
④  伸长率
【多选题】 建设单位在办理工程竣工验收备案时需要提交法律、行政法规规定的应当由( )等部门出具的认可文件或者准许使用文件。
①  财政
②  公安消防
③  规划
④  环保
【多选题】 总监理工程师在同意工程延期前应与( )协商,最好是与费用索赔放在一起考虑并给出妥善的处理方案。
①  建设单位
②  施工单位
③  设计单位
④  勘察单位
【多选题】 防水材料主要包括( )等。
①  粘结剂
②  止水带
③  膨胀胶条
④  密封膏
【多选题】 对改建、扩建和维修工程,建设单位应当组织( )据实修改、补充和完善工程档案。
①  设计单位
②  材料供应单位
③  监理单位
④  施工单位
【单选题】 ( )在建设工程竣工验收后,将建设工程竣工验收报告和公安消防、规划、环保等部门出具的认可文件或者准许使用文件报建设行政主管部门审核的行为。
①  设计单位
②  施工单位
③  设备供应单位
④  建设单位
【单选题】 ( )应根据施工进度计划的审查结果,在施工进度计划报审表中填写“同意”、“不同意”或者“应补充”的意见。
①  总监理工程师
②  专业监理工程师
③  企业技术负责人
④  项目经理
【单选题】 设计单位是受( )委托,在项目实施前为建设项目进行总体设计的单位,一般负责工程的初步设计和施工图设计。
①  建设单位
②  施工单位
③  监理单位
④  勘察单位