【单选题】【消耗次数:1】
Im looking forward as much to her return as she herself to ______ me.
have seen
seeing
meet
be met
参考答案:
复制
纠错
相关题目
【判断题】 I’m looking forward to meet you soon.
①  正确
②  错误
【单选题】 Im really looking forward to _____from you.
①  hear
②  hearing
③  hears
④  to hear
【单选题】 She found herself____ forward more eagerly to the holiday at home.
①  looking
②  bringing
③  desiring
④  expecting
【单选题】 I have been looking forward to ____ from my parents.
①  :hear
②  :being heard
③  :be heard
④  :hearing
【单选题】 She will be much [填空] in her mew class.
①  happy
②  happier
③  happiest
④  happyer
【判断题】 She’s much intelligent than me.
①  正确
②  错误
【单选题】 My sister falls while she is [填空] her bicycle and hurts herself.
①  ride
②  rideing
③  riding
④  rides
【判断题】 A: Let me introduce myself. Im Green. B: Pleased to meet you.
①  正确
②  错误
【单选题】 My daughter is really fond of the ( ) of the curtain in her bedroom which she chose herself.
①  drawing
②  pattern
③  style
④  design
【单选题】 _____ for the fact that she broke her leg, she might have passed the exam.
①  Had it not been
②  Hadnt itbeen
③  Was it not
④  Were it not
随机题目
【判断题】 甲类工程是固定资产方向调节税税率为0%的投资项。
①  正确
②  错误
【判断题】 材料费是指施工过程中耗用的构成工程实体的费用,不包括周转使用材料的摊销费用。()
①  正确
②  错误
【判断题】 装饰脚手架和里脚手架,均按水平投影面积以平方米计算。
①  正确
②  错误
【单选题】 初步设计方案通过后,在此基础上进行施工图设计,并编制()。
①  初步设计概算
②  修正概算
③  施工预算
④  施工图预算
【单选题】 装饰工程量计算中,天棚吊顶应扣除的是【】
①  墙垛的面积     
②  暗窗帘盒的面积    
③  筒灯孔的面积    
④  300*300换气扇的面积
【单选题】 对投标人报出的措施项目清单中没有列项且施工中又必须发生的项目,招标人______。
①  要给予投标人以补偿
②  应允许投标人进行补充
③  可认为其包括在其他措施项目中
④  可认为其包括在分部分项工程量清单的综合单价中
【单选题】 制定标底,应报______审定。
①  招标单位
②  招标投标办事机构
③  设计单位
④  监理单位
【单选题】 下面不属于建筑工程材料费的项目是【】
①  材料原价  
②  材料的运费
③  材料运输损耗费 
④  混泥土模板及支架费
【多选题】 建设项目静态总投资中应计入______。
①  基本预备费
②  基本预备费
③  建筑安装工程费
④  工程造价调整预备费
⑤  计划利润
【多选题】 下列费用项目应列入设备工器具费用的是______。
①  设备原价
②  设备从出厂地至工地仓库的运杂费
③  设备安装工程费
④  需安装设备的联合试运转费
⑤  设备的单机试运转费