【单选题】【消耗次数:1】
Man________die without air or water.
will
have to
must
should
参考答案:
复制
纠错
相关题目
【单选题】 15.Man _____ die without air or water.
①  will
②  have to
③  must
④  should
【单选题】 Without air, there __________ no living things.
①  will be
②  would be
【单选题】 16.—What made more than 100 passengers die. --- ________the air crash in Russia.
①  Itwas
②  Therewas
③  Thatwas
④  Thiswas
【单选题】 Water_________ both by man and other living things.
①  was needed
②  is needed
③  needs
④  are needed
【单选题】 Something must have happened on their way. Or they_____ by now.
①  should have arrived
②  should arrive
③  would have arrived
④  would arrive
【单选题】 You are ____ to have had the help of such a man.
①  thoughtful
②  considerate
③  fortunate
④  moderate
【单选题】 You must have stayed up late last night, _____?
①  mustn’ t you
②  don’ t you
③  didn’ t you
④  needn’ t you
【单选题】 The door opens, and who should enter but the very man we were talking of.
①  A.门开了,谁想到进来的正是我们刚才谈论的人。
②  B.门开了,除了那个我们正在谈论的人,谁应该进来?
③  C.门开了,谁还能进来,不就是那个我们刚才还在谈论的人嘛。
④  D.门开了,果然是我们刚才谈论的人进来了。
【单选题】 -________ keep water running when you are brushing your teeth or washing your hands, Jack.  -OK. I know we must save every drop(滴) of water.
①  Please
②  Why not
③  Don’t
④  do
【单选题】 ______ the storm, we should have reached our company.
①  Because of
②  In spite of
③  In case of
④  But for
随机题目
【多选题】 国际工程常用的费用索赔计算方法,主要有()。
①  实际费用法
②  实物量法
③  总费用法
④  合理价值法
⑤  审判裁定法
【多选题】 工程索赔可以分为。
①  经济索赔
②  工期索赔
③  人员索赔
④  施工索赔
【单选题】 什么是最后通牒?
①  规定的最后期限
②  签约合同
③  成功握手
④  添加微信
【单选题】 建设工程施工经常由于外界影响或意外干扰引起。
①  工期拖延
②  额外工程
③  水电工程
④  土木工程
【单选题】 什么是发达国家各种企业进入发展中国家的桥梁?
①  工程承包
②  市场营销
③  企业管理
④  企业发展
【单选题】 承包商应做好几点工作?
①  3点
②  4点
③  5点
④  6点
【多选题】 ICE与FIDIC不同之处在于。
①  无专用条件部分
②  对税收问题作了更详细的规定
③  对工程师的职权作了详细的规定
④  具体的规定了承包商的工程索赔
【多选题】 在合同管理工作中什么是管理工作的一项任务。
①  预防
②  减少索赔争端
③  贿赂
④  严重失密
【单选题】 水文气象条件对施工影响
①  甚大
②  不大
③  没有影响
④  没有作用
【单选题】 合理的计价方法是()。
①  实际费用法
②  总费用法
③  修正的总费用法
④  合理价值法