【单选题】【消耗次数:1】
It may only be through repeated experiments _______ a baby will come to accept the idea _______ other people can have different views from what he or she has.
how;which
how;that
that;that
which;which
参考答案:
复制
纠错
相关题目
【单选题】 Australia has its own identity ,which is very different from that of Britian.
①  busy
②  central
③  capable
④  cultural
【单选题】 He told me how he had given me shelter and protection without which I __________ of hunger.
①  would be died
②  would die
③  would have died
④  will die
【单选题】 As a ( ) student, he enjoys many conveniences and resources which are only wild wishes for other average ones.
①  tip
②  tap
③  top
④  pat
【单选题】 A culture in which the citizens share similar religious beliefs and values is more likely to have laws that represent the wishes of its people than where citizens come from _________ backgrounds.
①  identical
②  dramatic
③  extensive
④  diverse
【单选题】 She took it as an insult which wasn’t at all what I( ).
①  intend
②  intended
③  has intended
④  had intended
【单选题】 How can he ____if he is not ____?
①  listen--hearing
②  hear--listening
③  be listening--heard
④  be hearing--listened to
【单选题】 How can he ______ if he is not ______ ?
①  listen; hearing
②  hear; listening
③  be listening; heard
④  be hearing; listened to
【单选题】 Which of following can be said of the common features which are shared by the English and American Romanticists?
①  An increasing emphasis on the free expression of emotions.
②  An increasing attention to the psychic states of their characters.
③  An increasing emphasis on the desire to return to nature.
④  Both A and B.
【单选题】 37. 1000 guests were all found ____in the room which only ___800 people.
①  seat;seat
②  hold;hold
③  hold;seat
④  seated;hold
【单选题】 8.Do you have any idea what he meant? I really can’t ______ what he said at this morning’s meeting.
①  figure on
②  figure out
③  find out
④  find
随机题目
【多选题】 根据《建设工程施工合同》的规定,关于工程款(进度款)的叙述,正确的是().
①  A.在确认计量结果14天内,发包人应向承包人支付工程款(进度款)
②  B.按约定时间发包人应扣回的预付款,与工程款(进度款)同期结算
③  C.发包人超过约定的支付时间不支付工程款,承包人可向发包人发出要求付款的通知,发包人收到承包人通知后仍不能按要求付款,可与承包人协商签订延期付款协议,经承包人同意后可延期支付
④  D.发包人不按合同约定支付工程款,双方又未达成延期付款协议,导致施工无法进行的,应由承包人承担违约责任
【多选题】 混凝土坝施工质量检查和监测的方法包括().
①  A.物理监测
②  B.钻孔压水
③  C.大块取样
④  D.原型观测
【判断题】 季风的影响是导致降水时空分配不匀的主要原因
①  正确
②  错误
【判断题】 我国水旱灾害频繁,是世界上洪涝灾害最为严重地国家之一
①  正确
②  错误
【判断题】 水闸主轴线放样,就是在施工现场标定主轴线交点位置
①  正确
②  错误
【判断题】 雨水泵站水泵类型一般采用轴流泵,这是因为雨水泵站具有流量大扬程小的特点。
①  正确
②  错误
【判断题】 化工生产中常见的几种离心泵是水泵、杂质泵、气泵。
①  正确
②  错误
【判断题】 国家确定的重要江河、湖泊的流域综合规划,由国务院批准
①  正确
②  错误
【判断题】 国家提出“以水定城”战略的主要原因是城市灰色基础设施建设容易给城市 带来内涝等灾害,从而给国家造成巨额经济损失().
①  正确
②  错误
【判断题】 海绵城市建设应因城因地而异,科学规划、着眼于城市的可持续发展。这一工程具有复杂性和长期性,不会一蹴而就().
①  正确
②  错误