【单选题】【消耗次数:1】
Where is my pen? I________it.
might lose
would have lost
should have lost
must have lost
参考答案:
复制
纠错
相关题目
【单选题】 I have lost my white hat. I______ it somewhere.
①  must be dropping
②  must have dropped
③  must have been dropped
④  must drop
【单选题】 Ive lost my pen. I cant find it anywhere, so I have to buy ____ after school.
①  it
②  one
③  this
④  that
【单选题】 If the whole program __________ beforehand, a great deal of time and money would have been lost.
①  was not planned
②  were not planned
③  would not be planned
④  had not been planned
【单选题】 They are working hard to____ what they have lost.
①  make out for
②  keep up with
③  catch up with
④  make up for
【单选题】 The millions of calculations involved, ____ by hand, would have lost all practical value by the time they were finished.
①  had they been done
②  they had been done
③  having been done
④  they were done
【单选题】 The millions of circulations involved, _____ by hand, would have lost all practical value by the time they were finished.
①  had they been done
②  they had been done
③  having been done
④  they were done
【单选题】 The millions of circulations involved, _____ by hand, would have lost all practical value by the time they were finished.
①  had they been done
②  they had been done
③  having been done
④  they were done
【单选题】 Before the final examination, many students have shown ___ of tension. Some have trouble in sleeping while others have lost their appetite.
①  anxiety
②  marks
③  signs
④  remarks
【单选题】 13. Where is my pen? I ______ it.
①  might lose
②  would have lost
③  should have lost
④  must have lost
【单选题】 This book has been in the works so long that I have lost _____of most of the sources found for me by the staff of the library.
①  trace
②  trail
③  track
④  touch
随机题目
【判断题】 国际惯例是在国际实践中逐渐形成的
①  正确
②  错误
【判断题】 受要约人对要求内容表示同意的一种意思的表示为承诺。
①  正确
②  错误
【判断题】 特别恶劣气候条件,不可预见的地质状况,地震,海啸,飓风,施工中伤亡事故被简称为施工风险
①  正确
②  错误
【单选题】 受要约人对要求内容表示同意的一种意思的表示为。
①  承诺
②  平等
③  自愿
④  公开
【单选题】 施工现场变化索赔简称为。
①  APC
②  FBI
③  ABD
④  CAD
【单选题】 根据FIDIC合同条款,关于合理补偿承包人索赔的说法,正确的是()。
①  承包人遇到不利物质条件可进行利润索赔
②  异常恶劣天气导致的停工通常可以进行费用索赔
③  发包人原因引起的暂停施工只能进行工期索赔
④  发生不可抗力只能进行工期索赔
【单选题】 工程承包其中美国公司占有多少?
①  50%
②  150%
③  250%
④  350%
【单选题】 什么是承包商投资报价时,考虑施工方案的主要依据之一。
①  施工技术规程
②  依据资料
③  人文资料
④  工程师证
【单选题】 在做好工程承包施工同时,向综合经营方向。
①  拓展
②  管理
③  采纳
④  赔偿
【单选题】 工程索赔不仅是必不可少的。
①  业务
②  责任
③  环节
④  举动