【单选题】【消耗次数:1】
He was prepared to make the ultimate sacrifice, displaying ?bravery that was second to _________.
none
neither
anything
nothing
参考答案:
复制
纠错
相关题目
【单选题】 Neither the students nor the professor______ anything about it.
①  knows
②  know
③  is known
④  are knowing
【单选题】 Neither he nor I am a musician, _____?
①  am I
②  is he
③  are we
④  do we
【单选题】 ____ by this, he couldn’t say anything.
①  Satisfied
②  Feared
③  Frightened
④  Encouraged
【单选题】 He____________ working as if nothing had happened.
①  continue
②  continues
③  continuing
④  continued
【判断题】 Said nothing, he left the room angrily.
①  正确
②  错误
【单选题】 ___ he does has nothing to do with me.
①  Whatever
②  No matter what
③  That
④  If
【单选题】 There is no __________ that he will make the mistake again.
①  doubt
②  need
③  choice
④  time
【单选题】 She was wondering whether he has been writing anything new ____
①  late
②  later
③  latter
④  lately
【单选题】 10. ______, he was unable to make much progress.
①  Hard as he tried
②  Though hard as he tried
③  He tried hard
④  Because he tried hard
【单选题】 Sandy could do nothing but _______ to his teacher that he was wrong.
①  admit
②  admitted
③  admitting
④  to admit
随机题目
【单选题】 文明施工费属于()。
①  直接工程费
②  间接费
③  措施费
④  工程建设其他费用
【单选题】 在建安工程价款动态结算的调值公式中,各成本要素系数与固定系数之和应()。
①  <1
②  <1
③  =1
④  >1
【单选题】 通常原因和责任单一,双方容易达成协议,处理起来也比较简单的索赔称为()
①  工期索赔
②  费用索赔
③  单项索赔
④  综合索赔
【单选题】 不能认定为工伤的是()。
①  患职业病
②  上班途中受到机动车事故伤害的
③  醉酒导致伤亡的
④  在工作时突发疾病死亡的
【单选题】 易消除的因素为()
①  系统性因素
②  偶然性因素
③  随机性因素
④  变异性因素
【单选题】 直观的进度计划方法。
①  横道图
②  单代号网络图
③  双代号网络图
④  时标网络计划
【单选题】 已完工作实际费用,可用符号()来表示。
①  BCWP
②  BCWS
③  ACWP
④  ACWS
【单选题】 工程质量事故造成重伤3人以下或直接经济损失在10万元以下的事故为()
①  小事故
②  一般事故
③  未遂事故
④  重大事故
【单选题】 设计质量控制的依据中,体现项目发包人的建设意图的文件资料之一是()。
①  设计规范、规程
②  项目评估报告
③  选址报告
④  设计纲要
【单选题】 建设工程项目管理各参与方的工作任务中,最重要的任务是()。
①  投资控制
②  质量控制
③  合同管理
④  安全管理