【单选题】【消耗次数:1】
At her word she stood up and walked away, stopping at the window to pull back the curtain and _____.
look round
look out
look up
look on
参考答案:
复制
纠错
相关题目
【单选题】 At her word she stood up and walked away, stopping at the window to pull back the curtain and ____.
①  look round
②  look out
③  look up
④  look on
【判断题】 You’ve misspelled this word again. You’d better look it up.
①  正确
②  错误
【单选题】 Look out ! That tree _______ fall down.
①  is going to
②  will be
③  shall
④  would
【单选题】 Look out! That tree ___ fall down.
①  is going to
②  will be
③  shall
④  would
【单选题】 8.The girl was dancing about excitedly when suddenly she stood_______ and put on a horrified look.
①  silent
②  still
③  quiet
④  calm
【单选题】 Look out ! That tree_______ fall down.
①  is going to
②  will be
③  shall
④  would
【判断题】 Father didn’t look up from his book when I entered the living room.
①  正确
②  错误
【单选题】 Look!____________
①  Here your sister comes.
②  Here comes your sister.
③  Comes here your sister.
④  Your sister come here.
【单选题】 6.Look out! That tree _______ fall down.
①  is going to
②  will be
③  shall
④  would
【多选题】 _____________ , he had to stay at home to look after her.
①  His mother being ill
②  His mother ill
③  Although his mother was ill
④  As his mother was ill
随机题目
【判断题】 从公共管理的视角看,“使用者付费”和“政府付费”本质上是相同的,因此应将使用者付费类特许经营PPP模式内容政府采 购流程进行规范化管理。
① 
② 
【判断题】 PPP不应该成为政府向纳税人进行“二次收费”的理由。
① 
② 
【判断题】 PPP项目无论是使用者付费还是政府付费,都强调加强绩效管理,按绩效付费,确保公共产品和公共服务提供的质量和效率。
① 
② 
【判断题】 PPP项目的实施方案应由项目实施机构组织编制。
① 
② 
【判断题】 PPP项目社会资本方可以通过施工总承包等方式将完工风险转移给更为专业的工程保险机构。
① 
② 
【判断题】 建筑信息模型具有可视化,协调性,模拟性,优化性和可出图性五大特点。
① 
② 
【判断题】 BIM的全称叫着建筑信息化管理。
① 
② 
【判断题】 BIM是从日本的建筑业发展起来的,逐渐扩展的欧美发达国家。
① 
② 
【判断题】 关于在公共服务领域推广政府和社会资本合作模式的指导意见》(国办发〔2015〕42号)要求政府和社会资本合作模式应采取竞争性方式择优选择社会资本。
① 
② 
【判断题】 PPP模式通过引入社会资本,平滑财政支出,可以有效缓解地方政府债务压力。
① 
②