【单选题】【消耗次数:1】
I don’t know _______ to deal with such matter.
what
how
which
/
参考答案:
复制
纠错
相关题目
【单选题】 I don’t know what _______ to comfort her.
①  saying
②  to say
【判断题】 I don’t know what you are talking about.
①  正确
②  错误
【单选题】 39.He is said ___abroad, but I don`t know which country he studied in.
①  tohavestudied
②  tostudy
③  tobestudying
④  tohavebeenstudying
【单选题】 My daughter bought me an IPAD,but I don’t know_____.
①  A.what to know
②  B.which one to use
③  C.when to use
④  D.how to use it
【单选题】 I don’t know the place ________ he studied.
①  which
②  that
③  where
④  in where
【单选题】 27. I know the meeting will be on ______ Sunday in June, but I don’t know the exact date yet.
①  the
②  a
③  /
④  each
【单选题】 I don’t know you want to keep the letter, I’ve _____it up.
①  torn
②  given
③  broken
④  disposed
【单选题】 I don’t know the reason ___________ she is absent again today.
①  that
②  why
【单选题】 I don’t know why she avoids __________ her opinion on the subject.
①  to give
②  to be given
③  giving
④  being given
【单选题】 She took it as an insult which wasn’t at all what I( ).
①  intend
②  intended
③  has intended
④  had intended
随机题目
【判断题】 在时标网络计划中,波形线表示工作与其紧后工作之间的时间间隔。
①  正确
②  错误
【判断题】 网络计划的工期优化,就是通过压缩网络中全部工作的持续时间,以达到缩短工期的目的。
①  正确
②  错误
【单选题】 时间坐标网络计划的绘制方法宜按( )绘制
①  最早时间
②  最迟时间
③  最终时间
【单选题】 单代号网络图在绘图上弥补了双代号网络图的不足体现在
①  允许多个开始结点
②  允许循环线路
③  无虚箭线
【单选题】 通过不同工期及相应工程费用的比较,寻求与工程费用最低相应的 最优工期的方法称
①  工期优化
②  费用优化
③  资源优化
【单选题】 关键线路是决定网络计划工期的线路,与非关键线路间关系是
①  关键线路是不变的
②  关键线路可变成非关键线路
③  非关键线路间不可能成为关键线路。
【单选题】 施工程序是指单位工程中各( )间的先后次序及其制约关系
①  分部工程
②  分项工程
③  施工过程
【单选题】 同一施工过程流水节拍相等,不同施工过程的流水节拍及流水步距不一定相等的流水施工方式称
①  异节拍
②  非节奏
③  成倍节拍
【单选题】 “三材”通常是指
①  钢材、水泥、砖
②  钢材、砖、木材
③  钢材、木材、水泥
【单选题】 双代号网络图中,工作是用( )表示的
①  节点及其编号
②  箭线及其两端节点编号
③  箭线及其起始节点编号
④  箭线及其终点节点编号