【单选题】【消耗次数:1】
She is on a special ____to lose ____weight.
food; her
food;/
diet; her
diet;/
参考答案:
复制
纠错
相关题目
【单选题】 Because women often ____ their diet to control weight, they may not consume enough iron-rich food, and are liable to experience a deficiency.
①  restrict
②  strict
③  stuck
④  construct
【判断题】 Mrs. Fuller went on a diet and in three months brought down her weight to 100 pounds.
①  正确
②  错误
【单选题】 Everybody likes her because she is always _______ .
①  Everybody likes her because she is always _______ .
②  cheerful
③  sad
④  selfish
【单选题】 She got married although her parents had not given her their ___.
①  allowance
②  consent
③  permit
④  appreciation
【单选题】 She doesn’t speak ____ her friend, but her written work is excellent.
①  as well as
②  so often as
③  so much as
④  as good as
【单选题】 27.She did her work _________her manager had instructed.
①  as
②  until
③  when
④  though
【单选题】 There were dirty marks on her trousers ___ she had wiped her hands.
①  where
②  which
③  when
④  that
【单选题】 She?continued?to( )?her?innocence.
①  assertable
②  assertible
③  asserted
④  assert
【单选题】 I noticed she avoids making any reference _______ her first husband in her latest
①  with
②  in
③  on
④  to
【单选题】 Lily forgot_______a letter to her sister, so she wrote to her just now.
①  to have written
②  to write
③  having wrote
随机题目
【单选题】 如果用户所定义的项目的开始日期是周日,则默认情况下,MicrosoftProject会将最早开始的子任务的开始时间排定在()
①  紧接着的周一
②  当天
③  当周的最后一个工作日
④  下周二
【单选题】 任务M的优先级为500,任务N的优先级是800,任务P的优先级是300,则进行任务拆分时,哪个任务可以优先进行拆分()?
①  M
②  N
③  P
④  同时拆分
【单选题】 以下哪种任务可以没有时差
①  关键任务
②  非关键任务
③  周期性任务
④  摘要任务
【单选题】 在默认情况下Project的资源视图中的某些资源显示为红色,则表示该资源
①  已被分配
②  分配不足
③  分配过度
④  特殊资源
【单选题】 某项目的木工组有6名木工,其中有二名是兼职的,只有一半的时间投入在该项目中,则可在“资源工作表”视图中将木工资源的最大单位设置为
①  400%
②  500%
③  550%
④  600%
【多选题】 三坐标管理是指项目中的()
①  进度管理
②  费用管理
③  质量管理
④  X,Y,Z坐标
⑤  项目的地理位置
【多选题】 Project为用户提供的20多种预定义报表可以归纳为以下哪几类?()
①  任务报表
②  资源报表
③  进行中
④  仪表板
⑤  成本报表
【判断题】 资源分配过度只能通过“调配资源”的方法解决。
①  正确
②  错误
【判断题】 项目合并后,主项目与子项目的信息是不同步的。
①  正确
②  错误
【单选题】 以下哪项成本与任务工期的长短和资源分配的多少无关?()
①  任务的固定成本
②  摘要任务的成本
③  各子任务的成本
④  非关键任务的成本