【单选题】【消耗次数:1】
Neither the students nor the professor______ anything about it.
knows
know
is known
are knowing
参考答案:
复制
纠错
相关题目
【单选题】 Neither he nor I am a musician, _____?
①  am I
②  is he
③  are we
④  do we
【单选题】 Neither John nor his roommates _____ in the dormitory yesterday evening.
①  was
②  were
③  has been
④  had been
【单选题】 The students were all entertained in a Mexican restaurant, at Professor Brians ____.
①  money
②  pay
③  expense
④  loss
【判断题】 We cant do anything about it until we know the facts.此句是从属分句中的副词性分句。
①  正确
②  错误
【单选题】 Professor Smith, together with twenty of his students, [] coming to our school in May for a short visit.
①  is
②  are
【单选题】 Frankly speaking, I’d rather you ____ anything about it for the time being.
①  didn’t do
②  don’t do
③  will not do
④  do
【单选题】 Dont be too ____ about things youre not supposed to know.
①  strange
②  amusing
③  curious
④  conscious
【单选题】 Don’t be too ____ about things you are not supposed to know. ?
①  strange ?
②  amusing ?
③  curious ?
④  conscious?
【判断题】 I don’t know what you are talking about.
①  正确
②  错误
【单选题】 13.Don’t ______ to let me know if there’s anything I can do for you.
①  thrill
②  hesitate
③  reject
④  puzzle
随机题目
【多选题】 工程项目合同体系包括(  )。
①  前期咨询合同
②  勘查设计合同
③  工程承包合同
④  工程劳资合同
⑤  货物采购合同
【单选题】 工程项目总控的核心是(  )。
①  费用控制
②  合同控制
③  进度控制
④  质量控制
【单选题】 项目经理在建立工作基础这一步骤,所作的工作不包括(  )。
①  了解项目情况及工作任务
②  分析项目相关人员
③  组建项目团队
④  编制项目工作大纲
【单选题】 30%的变化,则敏感因素是(  )。
① 
② 
③ 
④ 
【单选题】 工程项目风险可分为技术风险和非技术风险,下列各项中属于非技术风险的是(  )。
①  材料及设备风险
②  施工技术风险
③  设计技术风险
④  生产工艺风险
【单选题】 进度计划的调整方法不包括(  )。
①  调整工作顺序,改变某工作间的逻辑关系
②  调整项目进度计划
③  调整资源消耗计划
④  缩短某些工作的持续时间
【单选题】 (  )项不属于制订风险应对计划的成果。
①  风险应对计划
②  剩余风险
③  需要的应急储备量
④  可能的应对措施清单
【单选题】 平行于一个投影面,垂直于另两个投影面的平面,称为投影面()。
①  垂直面
②  平行面
③  侧垂面
④  正立面
【单选题】 按照国家制图标准规定,图纸幅面只是图纸本身的大小规格,A1图纸的图幅尺寸是()。
①  594×841
②  210×297
③  297×420
④  210×420
【单选题】 立体被平面截切所产生的表面交线称为()。
①  相贯线
②  投射线
③  侧垂线
④  截交线