【多选题】【消耗次数:1】
He arrived too late and_____________ the train.
failed to catch
fail to catch
missed
miss
参考答案:
复制
纠错
相关题目
【单选题】 12. We didn’t catch the train _______ we left late.
①  so
②  because
③  but
④  though
【单选题】 He departed ____  to catch the train only to find his ticket was left in home.
①  in hurry
②  in haste
③  in a haste
④  with haste
【单选题】 Peter could hardly catch what I said, _____ he?
①  could
②  couldn’ t
③  did
④  didn’ t
【单选题】 When I arrived at the station, he[填空] the train.
①  left
②  leave
③  having left
④  had left
【单选题】 The child tiptoed(翘起脚尖走)quietly to the bird. _____ into the forest when he was about to catch it.
①  Flew it away
②  Away flew it
③  Away it flew
④  Flew away it
【单选题】 _____ that we couldn’ t catch up with him.
①  So fast he ran
②  So fast did he run
③  So fast ran he
④  Such fast did he run
【单选题】 17. Hurry up, _______ you will miss the train.
①  and
②  so
③  however
④  or
【单选题】 The train ____by the time Mr. Black arrived.
①  leaving
②  had left
③  left
④  having left
【判断题】 3.try-catch语句不可以嵌套使用。( )
①  正确
②  错误
【单选题】 The train______she was traveling was five minutes late.
①  that
②  which
③  on that
④  on which
随机题目
【单选题】 只测地物不测地貌的图称为平面图。
①  正确
②  错误
【单选题】 地物是指地面高低起伏的自然形态。
①  正确
②  错误
【单选题】 用建筑方格网作控制,适用于各种建筑场地。
①  正确
②  错误
【单选题】 施工平面控制网可以布设成三角网、( )。
①  建筑方格网
②  水准网
【单选题】 建筑场地的高程控制测量,一般采用水准测量的方法建立。
①  正确
②  错误
【单选题】 房屋基础墙是指±0.000m以下的砖墙,它的高度常用基础皮数杆进行控制。
①  正确
②  错误
【单选题】 在建筑物墙体施工中,墙身各部位标高通常是用皮数标杆进行控制的。
①  正确
②  错误
【单选题】 在工业建筑施工测量中,吊车梁安装测量主要是保证吊车梁中线位置及其标高符合设计要求。
①  正确
②  错误
【单选题】 建筑物沉降观测是用三角高程测量的方法进行的。
①  正确
②  错误
【单选题】 在受力作用后而不产生变形的物体称为,刚体是对实际物体经过科学的抽象和简化而得到的一种理想模型。
①  正确
②  错误