【单选题】【消耗次数:1】
In Britain, the season of the year is probably _____ spring.
later
last
latter
late
参考答案:
复制
纠错
相关题目
【单选题】 These children are ______ this year than they were last year.
①  more tall
②  more taller
③  very taller
④  much taller
【单选题】 These children are _________ this year than they were last year.
①  moretall
②  moretaller
③  verytaller
④  muchtaller
【单选题】 These children are_______this year than they were last year.
①  moretall
②  moretaller
③  verytaller
④  muchtaller
【单选题】 9. These children are ____this year than they were last year.
①  more tall
②  more taller
③  very taller
④  much taller
【判断题】 The cinema is built last year.
①  正确
②  错误
【单选题】 You must have stayed up late last night, _____?
①  mustn’ t you
②  don’ t you
③  didn’ t you
④  needn’ t you
【判断题】 Thousands of trees?were planted?last year.
①  正确
②  错误
【单选题】 A new school was _____ up in the village last year.
①  held
②  set
③  sent
④  bought
【单选题】 The bridge which ________ last year looks really beautiful.
①  was built
②  built
③  was set up
④  had been built
【单选题】 The bridge which ________last year looks really beautiful.
①  was built
②  built
③  was set up
④  had been built
随机题目
【判断题】 项目的选择应该基于项目的经济分析和财务分析,不能从非经济的角度来选择项目。( )
①  正确
②  错误
【判断题】 项目经理的职责是负责按项目章程的要求实施项目,因而无权修改项目章程。
①  正确
②  错误
【多选题】 定量的项目选择的方法有
①  投资回收期
②  投资回报率
③  净现值法
④  内部报酬率法
【多选题】 项目章程的内容包括
①  职能部门如何参与
②  项目经理及其权责
③  项目的初步预算
④  主要的项目干系人
【单选题】 项目管理的四大目标是( )
①  .范围、成本、进度、风险
②  成本、范围、质量、时间
③  成本、进度、质量、风险
④  范围、时间、质量、进度
【单选题】 下面哪种项目选择的方法考虑了货币的时间价值( )
①  投资回收期法
②  投资回报率法
③  净现值法
④  保本点分析
【单选题】 需求的产生与分析过程包括:(1)需求表达(2)需求确认(3)需求产生(4)技术要求(5)功能要求,他们按顺序依次是( )
①  (3)(2)(1)(4)(5)
②  (3)(2)(1)(5)(4)
③  (1)(2)(3)(4)(5)
④  (2)(3)(1)(4)(5)
【单选题】 在确定项目目标时,应该关注( )
①  时间和成本
②  范围
③  质量
④  以上同等程度关注
【判断题】 在项目干系人管理的对象是重要的项目干系人,至于一些不那么重要的项目干系人,如公众等,可以忽略不管。( )
①  正确
②  错误
【判断题】 云南鲁布革水电工程管理局是我国第一个符合现代项目管理要求的大型项目管理机构。( )
①  正确
②  错误