【单选题】【消耗次数:1】
Something must have happened on their way. Or they_____ by now.
should have arrived
should arrive
would have arrived
would arrive
参考答案:
复制
纠错
相关题目
【单选题】 15.We would have arrived two hours ago _____the traffic jam.
①  because of
②  as a result of
③  despite
④  but for
【单选题】 Would you like to have dinner with us this evening?
①  OK, but I have to go to a meeting now
②  No, I can’t
③  I’d love to, but this evening I have to go to the airport to meet my parents
④  I don’t know
【单选题】 — Would you like to have some icecream?— _______________
①  I don’t know.
②  No,thanks.
③  I dont like it.
④  I like it.
【单选题】 If I had remembered __________ the window, the thief would not have got in.
①  to close
②  closing
③  to have closed
④  having closed
【单选题】 ______ the storm, we should have reached our company.
①  Because of
②  In spite of
③  In case of
④  But for
【单选题】 30. -Would you like to have tea or coffee? - ____.
①  Either will do
②  Neither do I
③  It doesn’t matter
④  Yes, please
【单选题】 8. Bill saidthey would have _________ holiday.
①  a two-month
②  two months
③  two-months
④  two months
【单选题】 If I ___ it, I would do it in a different way.
①  were to do
②  do
③  had done
④  was to do
【判断题】 We wish that you hadnt have such a lot of work, because we know you would have enjoyed the party.
①  正确
②  错误
【单选题】 You should have put the milk into the icebox, I expect it ____ undrinkable.
①  became
②  had become
③  has become
④  becomes
随机题目
【多选题】 下列项目中,属于滚动预算优点的有( )。
①  透明度高
②  及时性强
③  连续性突出
④  完整性和稳定性突出
⑤  滞后性显著
【多选题】 下列各项中,属于全面预算体系构成内容的有( )。
①  业务预算
②  财务预算
③  专门决策预算
④  零基预算
⑤  滚动预算
【多选题】 下列各项中,属于专门决策预算内容的有( )。
①  融资决策预算
②  预计利润表
③  预计资产负债表
④  投资决策预算
⑤  销售预算
【多选题】 编制生产预算时需要考虑的因素有( )。
①  基期生产量
②  基期销售量
③  预算期预计销售量
④  预算期预计期初存货量
⑤  预算期预计期末存货量
【多选题】 下列各项中,属于产品成本预算编制基础的有( )。
①  销售预算
②  生产预算
③  直接材料采购预算
④  直接人工预算
⑤  制造费用预算
【多选题】 编制直接人工预算需要考虑的因素有( )。
①  基期生产量
②  生产预算中的预计生产量
③  预计销售量
④  标准单位直接人工工时
⑤  标准工资率
【多选题】 期末存货预算的编制依据有( )。
①  预计销售量
②  期末产成品存货成本预算额
③  原材料期末存货成本预算额
④  在产品存货成本预算额
【多选题】 下列各项中,能够为编制预计利润表提供信息来源的有( )。
①  销售预算
②  产品成本预算
③  销售及管理费用预算
④  制造费用预算
⑤  专门决策预算
【多选题】 下列各项中,属于全面预算作用的是( )。
①  明确工作目标
②  协调部门关系
③  开展日常活动
④  考核业绩标准
⑤  巩固部门成绩
【单选题】 无论是哪个成本项目,在制定标准成本时,都需要分别确定两个标准,两者相乘即为每一成本项目的标准成本,这两个标准是( )。
①  价格标准和用量标准
②  价格标准和质量标准
③  历史标准和用量标准
④  历史标准和质量标准