【单选题】【消耗次数:1】
I wont be free ________ I finish this work.
:after
:until
:but
:when
参考答案:
复制
纠错
相关题目
【单选题】 After I had [填空] quick meal,I hurried to work.
①  /
②  a
③  an
④  the
【单选题】 _______I like most is_______I can have a party after work.
①  That,that
②  What, that
③  What, what
【单选题】 _______ , I will help you with your work.
①  If I am possible
②  If it possible
③  If possible
④  Possible
【单选题】 I [] whether this plan will work.
①  suspect
②  doubt
【单选题】 I ___ go to bed until I ___ finished my work last night.
①  don’t; had
②  didn’t; have
③  didn’t; had
④  don’t; have
【单选题】 I ___________ a short rest before we continue the work.
①  produce
②  publish
③  propose
④  pull
【单选题】 It [填空] him an hour to finish his work.
①  take
②  takes
③  took
④  taking
【单选题】 They can’t leave until they ___ their work.
①  did
②  are doing
③  have done
④  has done
【单选题】 What I meant was that we should go[填空] with the work.
①  on
②  in
③  down
④  out
【单选题】 25. I can’t go—for one thing, I have no money, and ___, I have too much work.
①  what’s more 
②  as well 
③  for another 
④  in addition
随机题目
【单选题】 以下不属于挖一般土方清单项目特征描述的是()
①  土壤类别
②  挖土深度
③  设计尺寸
④  弃土运距
【单选题】 计算工程量时,独立基础中柱与柱的划分以()为分界线
①  室外地坪
②  柱基的扩大面
③  室内地坪
④  不确定
【单选题】 以下不属于不计算其建筑面积的是()。
①  舞台
②  露天游泳池
③  独立的烟囱
④  依附于建筑物的烟囱
【单选题】 外脚手架的高度自()算至檐口顶
①  设计室外地坪
②  设计室内地坪
③  自然地坪
④  设计地坪
【单选题】 厚度±30cm的竖向布置挖土或山坡切土,应按土方工程中()项目编码列项
①  挖沟槽土方
②  一般挖土方
③  挖基坑土方
④  挖山坡土方
【单选题】 10%和5%,则该项目的定额时间是()min
①  8.736
②  8.52
③  8.425
④  8.353
【单选题】 实心轻质砖不包括的是()
①  蒸压灰砂砖
②  蒸压粉煤灰砖
③  粉煤灰多孔砖
④  煤渣砖
【单选题】 下列构件计算工程量时,可不按立方米为单位计算的是()
① 
② 
③ 
④  楼梯
【单选题】 根据《建筑工程建筑面积计算规范》(GB/T50353-2013)规定,建筑物的建筑面积应按自然层外墙结构外围水平面积之和计算。以下说法正确的是()。
①  建筑物高度为2.00m部分,应计算全面积
②  建筑物高度为1.80m部分不计算面积
③  建筑物高度为1.20m部分不计算面积
④  建筑物高度为2.10m部分应计算1/2面积
【单选题】 下列关于外墙装饰抹灰工程量说法错误的是()
①  外墙各种装饰抹灰均按设计外墙抹灰的垂直投影面积计算
②  外墙装饰抹灰工程量=外墙面长度×抹灰高度-门窗等面积+垛梁柱的侧面抹灰面积
③  柱装饰抹灰工程量=柱结构断面周长×设计柱抹灰高度
④  柱装饰抹灰工程量=柱结构断面周长+设计柱抹灰高度