【单选题】【消耗次数:1】
It is _____ to rain.
likely
liked
may be
like
参考答案:
复制
纠错
相关题目
【单选题】 A: [填空], may I help you? B: Id like to book a single room, please.
①  Holiday Hotel
②  Speaking
③  Hey
④  Im Franco Rossi
【单选题】 Bread and butter ____ liked by Westerners.
①  is
②  are
③  were
④  be
【单选题】 I liked to play games years ago. [填空].
①  So he was
②  So was he
③  So did he
④  So he did
【单选题】 After so many weeks without rain, the ground quickly _____the little rain that fell last night.
①  skipped
②  soaked
③  retrieved
④  absorbed
【单选题】 It’s [填空] to rain.
①  going
②  come
③  coming
④  has
【单选题】 The first time I [填空] to Yunnan,I liked it very much.
①  come
②  came
③  comes
④  coming
【单选题】 The rain was heavy and ____ the land was flooded.
①  consequently
②  continuously
③  constantly
④  consistently
【单选题】 It is going to rain. The sky is getting _________ and ________.
①  dark, dark
②  darker and darker
③  darkest and darkest
④  dark and darker
【单选题】 A pretext was the last thing that Hastings was likely to want.
①  A.最后,哈丁斯好像需要一个借口。
②  B.哈丁斯可能不需要任何借口。
③  C.最后,哈丁斯可能想要的那个东西就是借口。
④  D.借口好像是哈丁斯想要的最后的东西。
【单选题】 Not until the rain stopped [填空]the room.
①  did he leave
②  he left
③  left he
④  did leave he
随机题目
【简答题】 <p>简述卷材防水屋面渗漏的产生原因及处理方法。</p>
【简答题】 依据无损检测技术的检测目的,通常将无损检测方法分为哪5大类?
【简答题】 <p>简述钢结构变形事故的处理方法。</p>
【简答题】 <p>简述水泥地面起砂、麻面的产生原因及处理方法。</p>
【单选题】 施工合同的合同工期是判定承包人提前或延误竣工的标准。订立合同时约定的合同工期概念应为,从()的日历天数计算。
①  合同签字日起按投标文件中承诺
②  合同签字日起按招标文件中要求
③  合同约定的开工日起按投标文件中承诺
④  合同约定的开工日起按招标文件中要求
【单选题】 邀请招标的邀请对象的数目不应少于()家。
①  2
②  3
③  5
④  7
【单选题】 下列财产中,()不得抵押。
①  土地所有权
②  土地使用权
③  房屋
④  交通运输工具
【单选题】 合同争议的解决顺序为()
①  和解—调解—仲裁—诉讼
②  调解—和解—仲裁—诉讼
③  和解—调解—诉讼—仲裁
④  调解—和解—诉讼—仲裁
【单选题】 设计人的设计工作进展不到委托设计任务的一半时,发包人由于项目建设资金的筹措发生问题而决定停建该项目,单方发出解除合同的通知。按照设计范本的规定,设计人应()
①  没收全部定金补偿损失
②  要求发包人支付双倍的定金
③  要求发包人补偿实际发生的损失
④  要求发包人付给合同约定设计费用的50%
【单选题】 监理招标主要是对监理单位()的选择。
①  报价
②  能力
③  监理人员数量
④  设备