【单选题】【消耗次数:1】
25. A pilot should be responsible ____ the safety of all the passengers on board.
against
for
at
with
参考答案:
复制
纠错
相关题目
【单选题】 He should be responsible [填空] that.
①  in
②  on
③  at
④  for
【单选题】 25.度是( )
①  事物的质量和数量的界限
②  事物保持其质的稳定性的数量界限
③  事物保持其量的稳定性的范围
④  事物发生变化的关节点
【单选题】 She was protesting against ______ government telling students what they should and should not eat at school.
①  bossy
②  patient
③  kind
④  fragile
【单选题】 6. What really ______ is that the teacher should be responsible for his students.
①  happens
②  cares
③  minds
④  matters
【判断题】 25. 片剂只能内服。
①  正确
②  错误
【单选题】 If you are not certain who should be held responsible for the loss, you might file a claim ________ the insurance agent there.
①  to
②  against
③  in
④  for
【判断题】 25.形式美就是美的形式。
①  正确
②  错误
【单选题】 25.体现儒家美学思想的是?
①  天地有大美
②  里仁为美
③  食必常饱,然后求美
④  信言不美,美言不信
【多选题】 25. 常用的助流剂有
①  淀粉
②  硬脂酸镁
③  滑石粉
④  液状石蜡
⑤  微粉硅胶
【单选题】 25. She put an extra blanket over the baby for fear that____.
①  he catches cold
②  he should catch cold
③  he caught cold
④  . he be catching cold
随机题目
【单选题】 工程量清单的主要作用有:为投标竞争提供一个平等的基础、为施工招标计价提供依据、为工程进度款支付提供依据、为工程索赔提供依据。
①  正确
②  错误
【单选题】 招标文件中的工程量清单表明的工程量是( )。
①  按施工图图示尺寸和清单工程量计算规则计算得到的工程净量
②  承包人在履行合同义务应予完成的实际工程量
③  设计文件结合不同施工方案确定的工程量均值
④  工程实体量和损耗量的合计
【单选题】 建设工程定额是指完成规定计量单位合格产品所必需的生产要素消耗量,包括( )消耗量。
①  人工 、材料、施工机械台班
②  资金、设备
【单选题】 在工人工作时间消耗的分类中,必须消耗的工作时间不应包括( )。
①  有效工作时间
②  休息时间
③  不可避免中断时间
④  偶然工作时间
【单选题】 某施工机械的时间定额为0.2台班/100m3,与之配合的工人小组有4人,则人工定额为( )。
①  0. 2工日/m3
②  0. 8工日/m3
③  0. 2 工日/100 m3
④  0. 8工日/100 m3
【单选题】 编制施工成本计划应满足组织对施工成本管理目标、合同规定的项目质量和工期、以经济合理的项目实施方案为基础、有关定额及市场价格等的要求。
①  正确
②  错误
【单选题】 实行项目经理责任制、编制工作流程图等措施是施工成本管理的( )。
①  组织措施
②  技术措施
③  经济措施
④  合同措施
【单选题】 下列定额中属于企业定额性质的是( )。
①  施工定额
②  预算定额
③  概算定额
④  概算指标
【单选题】 施工成本计划可以按照( )等方法进行编制。
①  企业组织结构、工程合同结构
②  施工成本组成、项目组成、工程进度
【单选题】 施工过程中,对于没有消耗定额的材料用量的控制,宜采用( )等方法。
①  招标控制
②  包干控制
③  计量控制
④  定额控制