【单选题】【消耗次数:1】
Water seeped from a ( ) in the pipe.
crack
cracking
cracker
cracked
参考答案:
复制
纠错
相关题目
【单选题】 ____ the water left in the kettle, the doctor put several things he unwrapped from a handkerchief.
①  At
②  To
③  Within
④  Into
【单选题】 ____ from space, our earth, with water covering 70% of its surface, appears as a “blue planet”.
①  Seeing
②  To be seen
③  Seen
④  Having seen
【判断题】 They are not water the plants now.
①  正确
②  错误
【单选题】 The plants died for____________ water.
①  lack of
②  in spite of
③  out of
④  despite of
【单选题】 Electric power is produced by __________ water.
①  falling
②  fallen
③  fall
④  fell
【判断题】 Two mineral water, please.
①  正确
②  错误
【单选题】 Water, when boiled, will____ steam.
①  give away
②  give up
③  give off
④  give out
【单选题】 Did Tom tell you to water the flowers?
①  No. And so did I
②  No. And neither did I
③  He did And so I did
④  He did And so do I
【单选题】 The flower is dead. I ____ it more water. ?
①  must give ?
②  should have given ?
③  ?would have given ?
④  will give ?
【单选题】 19.Never____ realised that water is so precious
①  hadI
②  I
③  haveI
④  didI
随机题目
【判断题】 在项目干系人管理的对象是重要的项目干系人,至于一些不那么重要的项目干系人,如公众等,可以忽略不管。( )
①  正确
②  错误
【判断题】 云南鲁布革水电工程管理局是我国第一个符合现代项目管理要求的大型项目管理机构。( )
①  正确
②  错误
【判断题】 项目管理五大过程组指的是启动、规划、执行、监控和收尾。( )
①  正确
②  错误
【判断题】 项目是由临时性的组织完成的。( )
①  正确
②  错误
【多选题】 建筑项目生命周期的阶段有( )
①  可行性研究
②  初步设计
③  施工
④  验收移交
⑤  详细设计
【多选题】 项目干系人可能包括( )
①  项目经理
②  项目团队
③  企业高层管理者
④  项目发起人
⑤  政府
【多选题】 项目管理五大过程组包括( )
①  启动
②  规划
③  执行
④  监控
⑤  收尾
【单选题】 每一个项目都有明确的开始和结束时间,当项目目标已经实现,就意味着项目的结束。这是对项目( )特性的表述。
①  独特性
②  渐进明细性
③  临时性
④  活动的整体性
【单选题】 ( )是企业项目的最终决策者?
①  项目业主
②  政府
③  项目经理
④  项目实施组织
【单选题】 项目管理的三重约束不包括( )
①  时间
②  周期
③  质量
④  成本