【单选题】【消耗次数:1】
He denied that his country wants to () Europe.
dominate
control
document
domestic
参考答案:
复制
纠错
相关题目
【单选题】 The reason that his property was confiscated by the country, it _____, was that he was involved in a lot of fraudulent activities during the war.
①  was turned out
②  was being turned out
③  being turned out
④  turned out
【判断题】 The true intellectuals left for Europe forever because they were not satisfied with their native country.
①  正确
②  错误
【单选题】 ( ) is an official document identifying the holder as a citizen of a particular country.
①  Visa
②  Passport
③  Boarding card
④  ID card
【单选题】 He wants to find a ______________ with a school.
①  hobby
②  information
③  position
④  power
【单选题】 In all his songs the great composer expresses a longing ________ his own country.
①  of
②  abou
③  for
④  to
【单选题】 It is generally considered unwise to give a child ______ he or she wants.
①  however
②  whatever
③  whichever
④  whenever
【判断题】 His government insisited that he stay until he finished his degree.
①  正确
②  错误
【单选题】 He was _____ his late twenties when he found his first job.
①  in
②  after
③  after
④  from
【单选题】 The eldest child is thoroughly ____ because they always give him whatever he wants.
①  wasted
②  spoiled
③  destroyed
④  uneducated
【判断题】 It is generally considered unwise to give a child ____whatever____ he or she wants.
①  正确
②  错误
随机题目
【单选题】 当网络图中某一非关键工作的持续时间拖延△,且大于该工作的总时差TF时,网络计划总工期因此将拖延( )。
①  △—TF
②  △+TF
③ 
④  TF—△
【单选题】 在没有技术间歇和插入时间的情况下,等节奏流水的( )与流水节拍相等。
①  工期
②  施工段
③  施工过程数
④  流水步距
【单选题】 所谓节奏性流水施工过程,即指施工过程( )。
①  在各个施工段上的持续时间相等
②  之间的流水节拍相等
③  之间的流水步距相等
④  连续、均衡施工
【判断题】 双代号网络图中不允许出现箭线交叉。
①  正确
②  错误
【单选题】 相邻两个施工过程进入流水施工的时间间歇称为( )。
①  流水节拍
②  流水步距
③  工艺间歇
④  流水间歇
【单选题】 某施工段的工程量为200m3 ,施工队的人数为25人,日产量0.8 m3 /人,则该队在该施工段的流水节拍为( )。
①  8天
②  10天
③  12天
④  15天
【单选题】 在组织加快成倍节拍流水施工时,施工段数m与施工队总数 ∑bi之间的关系应该是( )。
①  m≥∑bi
②  m≤∑bi
③  m=∑bi
④  无关系
【判断题】 总时差具有双重性,既为本工作所有,又属于整条线路。
①  正确
②  错误
【单选题】 双代号网络图中的虚工作( )。
①  即消耗时间,又消耗资源
②  只消耗时间,不消耗资源
③  即不消耗时间,又不消资源
④  不消耗时间,又消耗资源
【单选题】 ( ),会出现虚箭线。
①  当只有相同的紧后工作时
②  当只有不相同的紧后工作时
③  既有相同,又有不相同的紧后工作时
④  不受约束的任何情况